HDD Projects

HDD Braamfontein (Rock Drilling)

HDD Braamfontein (Rock Drilling)

2022
Braamfontein 200mm water crossing in Hard Rock.

HDD Lenasia (Water and Sewer)

HDD Lenasia (Water and Sewer)

2022
Lenasia 160mm water and sewer crossings HDD soft and boulder ground conditions

HDD Lenasia (Soft Ground)

HDD Lenasia (Soft Ground)

2022
Lenasia 315mm sewer crossing HDD soft material.

Pipe Reaming Botswana

Pipe Reaming Botswana

2023
Botswana upsizing of existing 300mm to new 450mm HDPE for 495 meters by means of Pipe Reaming

HDD Eldorado Park (River Crossing)

HDD Eldorado Park (River Crossing)

2022
Our longest HDD crossing for the year started off in Eldorado Park where we were tasked with installing a 450mm HDPE pipe for over a distance of 170 meters in one continuous pull.

HDD Fleurhof Soweto (Rock Drilling)

HDD Fleurhof Soweto (Rock Drilling)

2022
Soweto 180mm sewer crossing (HDD) in hard rock & HDPE Butt-Welding

HDD Heidelberg (Hard Ground)

HDD Heidelberg (Hard Ground)

2022
Heidelberg Horizontal Directional Drilling (HDD) & HDPE Butt-Welding for 160mm water lines

HDD Secunda (Rock Drilling)

HDD Secunda (Rock Drilling)

2023
Secunda HDD for 2 x 400mm water pipelines in Rock

HDD Bloemfontein (Soft to Rock)

HDD Bloemfontein (Soft to Rock)

2022
Our first HDD project for 2022 started in Bloemfontein with ground conditions ranging from soft to solid rock.